Miami Implodes 23-Story Mandarin Oriental Hotel on Brickell Key
Image: Українські Національні Новини (УНН)

Miami Implodes 23-Story Mandarin Oriental Hotel on Brickell Key

12 April, 2026.Business.10 sources

A 23-story Mandarin Oriental, Miami on Brickell Key was demolished by a controlled implosion. The implosion Sunday collapsed the hotel in about 20 seconds.

10 outlets5 divides9 facts unevenly covered

Read them yourself

Do not take our word for it. Here is what they published.

All 10 outlets

Full story

Mandarin Oriental Imploded

The 23-story Mandarin Oriental hotel was demolished in a controlled implosion on April 12, 2026.

A 23-story hotel in exclusive Miami locale vanishes in seconds with implosion

Associated PressAssociated Press

The building collapsed in less than 20 seconds following blasts at 8:30 a.m.

Image from ABC News
ABC NewsABC News

The demolition was the culmination of nearly two years of planning and coordination.

Residents within an 800-foot exclusion zone were asked to stay indoors.

The implosion was selected as the safest and most efficient method.

The site will be redeveloped into The Residences at Mandarin Oriental, Miami.

Community Reaction

Crowds gathered to watch the implosion from safe distances.

Over 400 people watched from the Brickell Bay Walk.

Image from abcnews
abcnewsabcnews

People cheered and recorded videos as the building collapsed.

Dust filled the air but dissipated within minutes.

Miami Police closed the Brickell Key Bridge and rerouted traffic.

City Commissioner Rosado called it a signal that Miami is the place to be.

Future Development

The new development will consist of two towers combining a hotel and private residences.

The north tower will include the new Mandarin Oriental hotel with 121 guest rooms

Miami HeraldMiami Herald

The north tower will have 121 guest rooms, about a third of the old hotel's capacity.

The south tower will be all private residences.

The move exemplifies a push towards the super high-end market.

Construction is scheduled to begin later in 2026.

Completion is targeted for 2030.