BBC News, on Climate, 6 November 2026

0.0out of 10Nothing found

Construction begins on Lewis Hub electricity project

No framing issues found.

Construction begins on Lewis Hub electricity project Image source, SSEN Transmission Image caption, The Lewis Hub forms part of wider plans to connect island renewable projects with mainland Scotland Published 38 minutes ago Work has begun on the first direct electricity connection between the Western Isles and Scottish mainland. The Lewis Hub, near Stornoway, will house a high voltage direct current (HVDC) switching station as part of the subsea cable.

SSEN Transmission said the project would have the capacity to export up to 1.8GW of renewable electricity to the UK grid while helping to strengthen energy security in the Western Isles. Highlands-based contractor RJ McLeod is to lead the first phase of construction. More stories from the Highlands and Islands News from the Highlands and Islands on BBC Sounds The hub site in Lewis will contain a HVDC converter station and alternating current (AC) substation, which will make it possible for electricity to travel through the connection.

Sandy Mactaggart, director of offshore delivery at SSEN Transmission said the project was about "unlocking the islands' vast renewable energy potential", and strengthening the electricity network. SSEN said the project would bring wider benefits to island communities, including investment in new housing and infrastructure projects. The company is to launch a £1.06m local fund, which is in addition to its contribution to refurbish the Caledonian Hotel in Stornoway and £3.4m of improvements to the Arnish Road.

Related topics Isle of Lewis Comhairle nan Eilean Siar Stornoway More on this story Backing in principle for SSEN Transmission's Lewis Hub Published 12 November 2025 Power firm invests in building of 147 new homes Published 5 November 2025 Major contract awarded for SSEN's Lewis Hub Published 14 January

Read the original article on bbc.co.uk (opens in a new tab)
About this analysis

BBC News reports that construction has started on the Lewis Hub, the converter and switching station for a subsea cable linking the Western Isles to the Scottish mainland, and sets out the company's stated capacity and community spending. The company's claims are attributed to SSEN Transmission and its director rather than stated in the BBC's own voice. Nothing in the article misleads its reader.

What it gets right

  • “SSEN Transmission said the project would have the capacity to export up to 1.8GW of renewable electricity to the UK grid”

    The BBC attributes the capacity figure and the energy security benefit to the company building the link, so the reader knows these are the developer's projections and not independently checked facts.

  • “SSEN said the project would bring wider benefits to island communities”

    The promised local benefits are given as the company's own claim, not as an established outcome.

Spot something we missed? Report this article

More from BBC News

  1. 7 NovWork to restore New Forest wildfire site gets under way3.0
  2. 6 NovUganda tree-planting scheme loses Welsh government funding0.0
  3. 6 NovNew images show scale of devastating Dunwich Heath wildfire0.0
  4. 6 NovLower rainfall means hosepipe ban to remain, Thames Water says3.0
  5. 6 NovA wildfire killed their loved ones in Spain. These British families demand to know why0.0

Everything we scored from BBC News