BBC News, on Climate, 25 October 2026

Extreme weather is reported with no climate link.

3.9

out of 10, scored on 3 of 11 checks. Few checks applied, so read it with that in mind.

Storms bring back rain but parts of Sussex still in severe drought

Rain returns but parts of Sussex still in severe drought Image source, Ben Leete/BBC Image caption, According to South East Water, Ardingly Reservoir was recorded as 17.1% full on 18 October By Cash Murphy South East Published 52 minutes ago Storm Austen and Storm Boelo, the first two named storms of the season, have brought lashing rain and heavy winds to Sussex. Damage included part of Brighton's iconic West Pier collapsing into the sea, one side of a petrol station roof in Newhaven coming loose, and a tree falling on to a platform at Angmering station. Over the summer the UK experienced multiple heatwaves and record-breaking temperatures , with parts of the county in a "severe drought" following a declaration made by the government earlier this month. But now the weather has turned wet and windy - so why is Sussex still in a severe drought? Image source, Reuters Image caption, Waves crashed over the lighthouse at Newhaven Harbour during Storm Austen on Friday The declaration of severe drought is not linked to current rainfall, but to reservoir levels. When making its recent assessment, the Environment Agency (EA) concluded that these levels have been significantly depleted by the South East experiencing its driest April to September in over a century. , external Specifically, the government said the change to severe drought status had been prompted by concerns for two major reservoirs, Ardingly in West Sussex and Wimbleball in Somerset. Ardingly serves 280,000 customers across East and West Sussex. On 14 October, South East Water said the reservoir was 19.4% full. A day later, severe drought was declared. The latest reading reveals that Ardingly is 17.1% full, prompting the water company to reduce the daily volume of water released from the reservoir into the River Ouse to protect drinking supplies . According to research published by the EA and the Department for Environment, Food and Rural Affairs in September, England needs 120% of its typical rainfall over the next seven months , external for all areas to be considered out of drought. Image source, South East Water Image caption, Images of what the planned new reservoir near Canterbury would look like have been released No new major reservoirs have been built in England since 1992. However, in 2024 the government announced proposals to build nine by 2050. South East Water has submitted a proposal to build a new reservoir at Broad Oak, near Canterbury. The company expects an outline planning application to be ready in 2028, and if approved, construction would begin in 2031 ahead of water supply beginning in 2035 . Follow BBC Sussex on Facebook , external , on X , external , and on Instagram , external and listen to BBC Radio Sussex on Sounds . Send your story ideas to southeasttoday@bbc.co.uk , external or WhatsApp us on 08081 002250. Related topics Drought Environment Agency More on this story Fresh drought measures to protect drinking water Published 2 days ago Reservoir falls below 20% as drought persists Published 14 October Parched South East revealed in drone images Published 18 August Related internet links Environment Agency South East Water

Read the original article on bbc.com (opens in a new tab)

Spot something we missed? Report this article

More from BBC News

  1. 24 OctStorm Boelo: Hundreds of North West homes without power0.0
  2. 24 OctScottish Greens call on Swinney to stop 'swithering' on oil and gas3.8
  3. 24 OctHabitat destroyed by Cairngorms fire to be restored with government funding2.8
  4. 24 OctThousands without power as South West stormy weather continues3.9
  5. 24 OctPortland Beach Road may close as high tides bring flood risk5.0

Everything we scored from BBC News