Metro reports TfL's warning that Vauxhall Bridge may have to close unless repairs are funded, and attributes the warning to TfL. Its figures are where it goes wrong: it gives a two-year timescale where TfL gave two to four years, presents the government's £1bn fund as the sum TfL sought for repairs estimated at about £60m, and gives an 18.5-tonne limit where coverage says 18 tonnes.
Uses figures that mislead
Serious
“could be closed to fire engines and buses within two years”
Why this matters
Gives the shortest end of TfL's timescale as the point at which buses and fire engines could lose the bridge. The phrase within two years stands alone with no range.
The impression it gives
Buses and fire engines are likely to lose Vauxhall Bridge within two years.
The context
TfL's warning gives a range of two to four years for closure to buses and fire engines, unless about £60m is invested. Metro's own S7 gives four to 10 years for closure to all traffic, so the single two-year figure is not the one TfL gave.
Vauxhall Bridge could have to shut to buses and fire engines within two to four years unless about £60m is invested in repairs, TfL has warned.
Uses figures that mislead
Serious
“TfL has applied for £1,000,000,000 in funding for the repairs”
Why this matters
Places the £1,000,000,000 figure beside the word repairs, so the sum reads as the money TfL has sought for this work.
The impression it gives
TfL is asking for £1bn to repair Vauxhall Bridge.
The context
£1bn is the size of the government's structures fund that TfL applied to, not the cost of the repairs. The coverage puts the repair cost at about £60m.
TfL has applied to the government’s £1bn structures fund for money towards repairs that it estimates at about £60m.
Makes a false claim
Minor
“18.5-tonne restriction”
Why this matters
States the existing weight restriction on the bridge as 18.5 tonnes, in the outlet's own voice.
The impression it gives
Vauxhall Bridge is currently restricted to vehicles of 18.5 tonnes.
The context
The restriction TfL reports is 18 tonnes. The coverage says an 18-tonne limit was introduced in July, and that an 18-tonne weight restriction is currently in place.
Uses the word staggering in the outlet's own voice to give a verdict on the repair cost.
The impression it gives
The £60m repair bill is an exceptional and shocking sum.
The context
£60m is TfL's own estimate of the repair cost. The coverage sets it against TfL spending about £30m a year on renewing its structures, and the word adds a verdict the reported figures do not state.